What does pag 02 stand for?

What does pag 02 stand for?

The Department of Environmental Protection (DEP) published a reissued PAG-02 NPDES General Permit for Discharges of Stormwater Associated with Construction Activities (PAG-02) and associated documents (2019 General Permit), a new individual NPDES permit application, and a host of new permit-related forms in December …

What is an Npdes permit Pennsylvania?

NPDES (National Pollutant Discharge Elimination System) permits are required for construction sites equal or larger than one acre (equal to or greater than one acre of earth disturbance). The permit must be in to hand before earthwork begins.

What is pollutant under Npdes?

The term pollutant is defined very broadly in the Clean Water Act . It includes any type of industrial, municipal, and agricultural waste discharged into water.

Why is NPDES important?

Overview. The NPDES permit program, created in 1972 by the Clean Water Act (CWA), helps address water pollution by regulating point sources that discharge pollutants to waters of the United States.

What is a waste discharge requirement?

Waste discharge requirements adopted under the WDR Program protect surface water by either prohibiting discharge of a pollutant to waters of the U.S. or prescribing requirements for discharge to surface waters that are not waters of the U.S., and they protect groundwater by prescribing waste containment, treatment, and …

What regulates NPDES?

As authorized by the Clean Water Act, the NPDES Permit Program controls water pollution by regulating point sources that discharge pollutants into waters of the United States.

What is discharge permit?

1. Wastewater Discharge Permit also known as the Permit refers to the legal. authorization granted by the Regional Office to discharge liquid waste and/or. pollutants of specified concentration and volume into any water or land.

What is WDR in wastewater?

Waste Discharge Requirements for Wastewater, Waste Residuals, & Recycled Water. The Waste Discharge Requirements (WDR) Program regulates all discharges of waste to land.

How do you get a discharge permit?

WHAT ARE THE REQUIREMENTS:

  1. Duly accomplished and notarized Application Form.
  2. Photocopy of LLDA Clearance.
  3. Water bills/readings for the last three (3) months registered in the name of the applicant.
  4. Water Treatment Facility and Drainage Plan layout, with complete specifications of the treatment process.

How long is the validity of discharge permit in the Philippines?

A Wastewater Discharge Permit is valid for a minimum period of one year, unless suspended or revoked sooner.

What is effluent sampling?

Effluent samples are collected and then analyzed and averaged to evaluate system performance. For onsite and other small flow wastewater treatment systems, the design of the sampling port plays an extremely important role in determining whether or not the sample collected is actually representative of system effluent.

What are WDRs?

Waste discharges that can be exempted from the California Code of Regulations (CCR) requirements are issued waste discharge requirements (WDRs) and are regulated by the WDR Program.